From 554c84f8eb4027c2e3b0cf104ad80a42c68b6bb7 Mon Sep 17 00:00:00 2001 From: =?UTF-8?q?=E6=A2=81=E8=96=84=E4=BA=91?= Date: Mon, 3 Aug 2026 21:50:37 +0800 Subject: [PATCH] docs: design windowed EM planner execution --- ...03-em-planner-windowed-execution-design.md | 366 ++++++++++++++++++ 1 file changed, 366 insertions(+) create mode 100644 docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md diff --git a/docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md b/docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md new file mode 100644 index 0000000..16bc46d --- /dev/null +++ b/docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md @@ -0,0 +1,366 @@ +# EM Planner 多窗口执行与交接设计 + +## 1. 目标 + +将已批准的 28 个 EM Planner 实施任务拆成多个相互独立、可恢复的 Codex 窗口阶段,使每个窗口只需要有限上下文即可安全继续工作。 + +该设计解决以下问题: + +- 避免单个会话连续执行 28 个任务造成上下文持续膨胀; +- 避免每个新窗口重新理解完整聊天历史; +- 保证任务、提交、验证和下一步之间存在可审计的交接链; +- 保证新窗口不会误改当前工作区中大量既有用户变更; +- 保证中途关闭、上下文压缩或执行失败后能够从文件和 Git 状态恢复; +- 保持 Foundation、OSQP、LS、ST、Rolling 五个子系统的边界。 + +## 2. 基本原则 + +### 2.1 阶段大小 + +一个窗口执行一个阶段,一个阶段最多包含三个连续任务。 + +优先保持子系统边界,不为满足“三个任务”而把两个不同子系统强行放入同一个窗口。因此 OSQP 和 LS 的收尾阶段各只有两个任务。 + +### 2.2 信息来源优先级 + +新窗口按以下优先级读取信息: + +1. 当前 Git 工作区和分支; +2. `em-planner-progress.md` 中最近一次已提交检查点; +3. 当前阶段对应的实施计划任务; +4. EM Planner 总体设计规范; +5. 最近相关提交; +6. 旧聊天记录仅作为可选背景,不是继续执行的必要条件。 + +若进度文件与 Git 事实不一致,以 Git 已提交内容和实际验证结果为准,并先修复进度文件再继续。 + +### 2.3 一次只推进一个阶段 + +窗口不得提前实现下一阶段任务。当前阶段通过完整验收、完成检查点提交并生成下一窗口提示词后,当前窗口即结束。 + +### 2.4 任务提交与阶段检查点 + +实施计划中每个任务仍保留独立功能提交。完成该阶段所有任务后,再提交一次只包含进度文件的阶段检查点。 + +提交顺序如下: + +```text +Task N 功能/测试提交 +Task N+1 功能/测试提交 +Task N+2 功能/测试提交 +阶段验证 +进度文件检查点提交 +``` + +阶段检查点不得混入生产代码、测试代码、二进制或其他文档修改。 + +## 3. 十个窗口阶段 + +### 阶段 1:Foundation 契约与边界 + +计划:`2026-08-03-em-planner-foundation-implementation.md` + +包含: + +1. Task 1 — Verification Host and Immutable Contracts; +2. Task 2 — Configuration, Diagnostics, and Request Validation; +3. Task 3 — Direction Segmentation and Exact Boundary Anchors。 + +阶段出口:验证宿主可运行;核心请求/结果/轨迹契约存在;配置和状态验证确定;换向配对与精确边界锚点测试通过。 + +### 阶段 2:Foundation 坐标与走廊 + +计划:`2026-08-03-em-planner-foundation-implementation.md` + +包含: + +1. Task 4 — Reverse-Safe Frenet Projection and Reconstruction; +2. Task 5 — Topology-Preserving Static Corridor; +3. Task 6 — Foundation Documentation and Gate。 + +阶段出口:前进/倒车投影和重建通过;静态走廊保持既有绕障拓扑;`all-foundation` 验收通过。 + +### 阶段 3:OSQP 契约与原生加载 + +计划:`2026-08-03-em-planner-osqp-backend-implementation.md` + +包含: + +1. Task 1 — Solver-Neutral Sparse QP Contracts; +2. Task 2 — Reproducible OSQP 1.0.0 Native Package; +3. Task 3 — Absolute-Path Native Loader and ABI Structures。 + +阶段出口:稀疏 QP 契约通过;固定 OSQP 原生包、许可证和哈希存在;绝对路径加载与失败诊断通过。 + +### 阶段 4:OSQP 求解与验收 + +计划:`2026-08-03-em-planner-osqp-backend-implementation.md` + +包含: + +1. Task 4 — OSQP Solve Lifecycle and Status Mapping; +2. Task 5 — Backend Completion Gate。 + +阶段出口:固定可行/不可行 QP 状态正确;重复分配和释放稳定;干净插件目录加载通过。 + +### 阶段 5:LS 模型与几何验证 + +计划:`2026-08-03-em-planner-lateral-ls-implementation.md` + +包含: + +1. Task 1 — Variable Layout and Exact Discrete Lateral Dynamics; +2. Task 2 — Normalized Objective and Linear Hard Constraints; +3. Task 3 — Nonlinear Geometry Evaluation and Independent Validation。 + +阶段出口:LS 变量布局、离散动力学、代价和硬约束系数测试通过;世界坐标重建和车辆曲率独立验证通过。 + +### 阶段 6:LS SQP 与真实场景 + +计划:`2026-08-03-em-planner-lateral-ls-implementation.md` + +包含: + +1. Task 4 — Sequential Convex Outer Loop and Feasible-Candidate Fallback; +2. Task 5 — Real-OSQP Lateral Scenarios and Gate。 + +阶段出口:SQP 外循环、信赖域和最后可行解回退通过;真实 OSQP 横向场景通过;输出实际 `PathS`。 + +### 阶段 7:ST 模型与纵向优化 + +计划:`2026-08-03-em-planner-longitudinal-st-implementation.md` + +包含: + +1. Task 1 — Speed Envelope over Actual PathS; +2. Task 2 — Time-Knot Layout, Dynamics, Objective, and Hard Constraints; +3. Task 3 — Longitudinal Outer Loop and Strict Validation。 + +阶段出口:速度包络、停车预检、ST 动力学、代价、约束和纵向外循环通过。 + +### 阶段 8:轨迹发布与单次规划服务 + +计划:`2026-08-03-em-planner-longitudinal-st-implementation.md` + +包含: + +1. Task 4 — Complete Trajectory Assembly and Redundant-Field Consistency; +2. Task 5 — Independent World-Space Publication Validator; +3. Task 6 — Pure One-Shot EmPlanningService。 + +阶段出口:完整轨迹字段一致;世界坐标发布验证通过;纯单次规划流水线和状态覆盖通过。 + +### 阶段 9:滚动协调与换向执行 + +计划:`2026-08-03-em-planner-rolling-execution-implementation.md` + +包含: + +1. Task 1 — Cycle Identity, Scheduling Decision, and Stale-Result Suppression; +2. Task 2 — Safe Previous-Trajectory Handoff; +3. Task 3 — Gear-Switch State Machine and Trajectory Executor。 + +阶段出口:最新版本发布、旧结果淘汰、安全拼接、零速换向状态机通过。 + +### 阶段 10:控制适配、插件发布与总验收 + +计划:`2026-08-03-em-planner-rolling-execution-implementation.md` + +包含: + +1. Task 4 — Generic Control Adapter; +2. Task 5 — Plugin Output and License Packaging; +3. Task 6 — Rolling End-to-End and Final Gate。 + +阶段出口:通用控制命令通过;`ClumsyPilot.dll`、`osqp.dll` 和许可证目录打包通过;第一版 EM Planner 全链路验收通过。 + +## 4. 进度文件设计 + +实施时创建: + +```text +docs/superpowers/progress/em-planner-progress.md +``` + +它是跨窗口唯一的人工可读运行状态文件,包含以下固定章节: + +````markdown +# EM Planner Execution Progress + +## Current State +- Current stage: +- Stage status: +- Current branch: +- Last checkpoint commit: + +## Completed Tasks +| Stage | Plan | Tasks | Commits | Verification | + +## Current Verification +- Commands: +- Result: +- Verified commit: + +## Preserved Workspace State +- Existing unrelated changes remain untouched. +- Known baseline build issue: + +## Decisions Needed +- None, or an exact blocking decision. + +## Next Stage +- Stage: +- Plan: +- Tasks: +- Entry checks: +- Exit gate: + +## Next-Window Prompt +```text +可直接复制的完整提示词 +``` +```` + +状态仅允许: + +```text +NotStarted +InProgress +Blocked +Completed +``` + +只有阶段出口验证真实通过后,才能写入 `Completed`。 + +## 5. 新窗口启动协议 + +每个窗口开始时必须依次执行: + +1. 确认当前工作目录和分支; +2. 读取总体设计规范; +3. 读取本多窗口执行规范; +4. 读取进度文件; +5. 读取当前阶段对应计划中的指定任务; +6. 检查 `git status --short`,不得把既有无关修改当成本阶段修改; +7. 检查进度文件记录的最后提交是否存在; +8. 运行进度文件列出的阶段入口验证; +9. 若入口验证与记录不一致,停止实施,先诊断并修正交接状态; +10. 使用当前阶段计划开始 TDD 实施。 + +新窗口不需要读取 28 个任务的全部计划,只读取当前阶段对应计划和必要的前置接口文件。 + +## 6. 窗口结束协议 + +阶段结束前必须依次执行: + +1. 确认该阶段每个任务都有独立提交; +2. 确认每个提交只包含计划指定文件; +3. 运行阶段出口验证; +4. 运行 `git diff --check`; +5. 记录实际测试命令、退出码和关键输出; +6. 检查暂存区为空; +7. 更新进度文件中的已完成任务、提交和验证证据; +8. 填写下一阶段入口检查、任务和出口门槛; +9. 生成下一窗口提示词; +10. 单独提交进度文件; +11. 再次确认用户原有工作区修改仍被保留; +12. 向用户返回本阶段摘要和下一窗口提示词。 + +任何测试未通过时,不得把阶段标记为完成,也不得生成声称前置条件已满足的下一窗口提示词。 + +## 7. 下一窗口提示词模板 + +阶段结束时按实际阶段号、提交号和验证命令填充以下模板: + +```text +请继续 ParkingRobot 仓库的 EM Planner 多窗口实施。 + +工作目录:D:\Users\Desktop\项目\prakrobot\ParkingRobot + +必须先完整读取: +1. docs/superpowers/specs/2026-08-03-em-planner-ls-st-design.md +2. docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md +3. docs/superpowers/progress/em-planner-progress.md +4. <当前阶段对应计划路径> + +本窗口只执行阶段 :<阶段名称>。 +只执行计划中的 Task <范围>,不得提前执行下一阶段。 + +开始前: +- 检查当前分支、git status 和进度文件记录的最近检查点提交; +- 运行进度文件中的阶段入口验证; +- 保留所有既有无关工作区修改,不得清理、覆盖或顺带提交; +- 若进度与 Git 或验证结果不一致,先诊断并报告,不要直接实施。 + +执行要求: +- 按对应实施计划逐任务使用 TDD; +- 每个任务只提交计划指定文件并形成独立提交; +- 不使用子代理; +- 不实现当前阶段范围外功能; +- 不处理已明确延期的动态障碍预测和动态绕障决策; +- 生产代码不得依赖 UI、硬件对象或当前工作目录; +- 任何完成声明前运行计划指定验证。 + +阶段结束时: +- 运行完整阶段出口验证和 git diff --check; +- 更新并单独提交 docs/superpowers/progress/em-planner-progress.md; +- 返回完成任务、提交、测试证据、遗留问题; +- 给出阶段 可直接复制的新窗口提示词。 +``` + +阶段 10 完成时,最后一项改为输出全链路验收结果,不再生成下一实施窗口提示词。 + +## 8. 工作区保护 + +当前仓库已有大量与 EM Planner 无关或作为前置工作的未提交修改。每个窗口必须: + +- 在开始和结束时保存 `git status --short` 结果用于范围对照; +- 使用显式文件路径暂存,不使用 `git add .` 或 `git add -A`; +- 不使用 `git reset --hard`、`git checkout --` 或清理未跟踪文件; +- 不修改计划范围外的 Map、CoarsePath、PathSmoothing 和旧 `auto_avoidance` 文件; +- 修改已有脏文件 `ClumsyPilot.csproj` 前先查看差异,只追加计划要求的最小变更; +- 每次提交后用 `git diff-tree` 核对提交文件集合; +- 发现与本阶段文件重叠的未知用户修改时停止并请求确认。 + +已知主项目构建可能被旧 `auto_avoidance/MultiWheelAutoAvoidance.cs` 缺少 `NetTopologySuite` 和 `OpenCvSharp` 引用阻断。各阶段必须运行隔离的 EM 验证宿主;不得通过擅自删除旧功能来使主项目构建通过,也不得把该既有错误声明为 EM 回归。 + +## 9. 失败与恢复 + +### 9.1 任务中途失败 + +保留已提交的前置任务。未完成任务不得提交半成品;若工作区已有该任务的未提交修改,在进度文件中记录准确文件和失败命令,阶段状态写为 `Blocked` 或 `InProgress`,不得写为 `Completed`。 + +### 9.2 窗口意外关闭 + +新窗口通过以下顺序恢复: + +```text +git status +git log 最近相关提交 +进度文件最近检查点 +对应计划中第一个未完成任务 +该任务的失败/通过验证 +``` + +如果功能提交存在但进度文件未更新,以提交和测试为依据补写检查点;不得重复实现已经完成的任务。 + +### 9.3 验证记录过期 + +若进度文件记录的 `Verified commit` 不是当前相关 HEAD,新窗口必须重新运行入口验证。不得复用其他提交上的通过结果。 + +### 9.4 外部依赖缺失 + +OSQP 构建工具、原生 DLL 或许可证无法获得时,仅阻塞 OSQP 对应阶段。记录实际缺失项和命令输出;不得用假 DLL、空文件或跳过验证继续 LS/ST 集成。 + +## 10. 成功标准 + +多窗口执行协议满足以下条件时视为设计落地: + +1. 28 个任务被完整且无重复地映射到 10 个阶段; +2. 每阶段最多三个任务且不跨子系统边界; +3. 任意新窗口无需旧聊天记录即可定位当前任务; +4. 每个已完成阶段都有功能提交、阶段验证证据和进度检查点提交; +5. 任何失败都能明确定位到任务、文件、命令和提交; +6. 用户既有工作区修改不会被暂存、提交、清理或覆盖; +7. 阶段 1 至阶段 9 均产生可直接复制的下一窗口提示词; +8. 阶段 10 产生完整的第一版 EM Planner 验收报告。