# EM Planner Execution Progress ## Current State - Current stage: 1 — Foundation contracts and boundaries - Stage status: NotStarted - Current branch: `trajplanner` - Last checkpoint commit: None; Stage 1 has not started - Protocol design baseline: `554c84f` - Implementation-plan baseline: `8dd8ff0` ## Completed Tasks | Stage | Plan | Tasks | Commits | Verification | |---:|---|---|---|---| | — | — | — | — | No implementation task has started | ## Current Verification - Commands: - `git cat-file -e 554c84f^{commit}` - `git cat-file -e 8dd8ff0^{commit}` - `git branch --show-current` - `git diff --cached --name-only` - Result: Bootstrap prerequisites passed; Stage 1 entry is ready - Verified commit: `554c84f` for protocol design and `8dd8ff0` for implementation plans ## Preserved Workspace State - The workspace already contains many unrelated Map, CoarsePath, PathSmoothing, project-file, report, and documentation changes. They belong to the user and must remain untouched and unstaged. - Use explicit file paths for every `git add`; never stage the whole workspace. - Inspect the existing diff before modifying `ClumsyPilot/ClumsyPilot.csproj`, then append only the Stage 1 rules required by the Foundation plan. - The normal `ClumsyPilot.csproj` build can be blocked by legacy `auto_avoidance/MultiWheelAutoAvoidance.cs` references to `NetTopologySuite` and `OpenCvSharp`. - Stage 1 must use the isolated `EMPlannerVerificationHost` rule from the Foundation plan. Do not delete or rewrite legacy functionality to hide the baseline build failure. ## Decisions Needed - None. The Stage 1 scope and contracts are approved. ## Next Stage - Stage: 1 — Foundation contracts and boundaries - Plan: `docs/superpowers/plans/2026-08-03-em-planner-foundation-implementation.md` - Tasks: - Task 1 — Verification Host and Immutable Contracts - Task 2 — Configuration, Diagnostics, and Request Validation - Task 3 — Direction Segmentation and Exact Boundary Anchors - Entry checks: - Confirm branch `trajplanner`. - Confirm commits `554c84f` and `8dd8ff0` exist. - Confirm the staging area is empty. - Capture `git status --short` before editing. - Confirm no prior Stage 1 functionality commit is recorded; if EM files already exist, inspect and reconcile them before continuing. - Exit gate: - Each of Foundation Tasks 1–3 has its own passing verification and independent commit. - The Foundation verification host passes `foundation` and `segmentation` groups required through Task 3. - Exact gear-switch approach/departure identities and exact horizon anchors are verified. - `git diff --check` reports no new whitespace errors. - The staging area is empty after all task commits. - This progress file is updated to mark Stage 1 completed and Stage 2 ready, then committed alone. ## Next-Window Prompt ```text 请继续 ParkingRobot 仓库的 EM Planner 多窗口实施。 工作目录:D:\Users\Desktop\项目\prakrobot\ParkingRobot 本窗口是阶段 1:Foundation 契约与边界,只执行 Foundation 实施计划的 Task 1–3,不得提前执行 Task 4 或后续阶段。 开始工作前必须完整读取: 1. docs/superpowers/specs/2026-08-03-em-planner-ls-st-design.md 2. docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md 3. docs/superpowers/progress/em-planner-progress.md 4. docs/superpowers/plans/2026-08-03-em-planner-foundation-implementation.md 执行时使用 executing-plans、test-driven-development 和 verification-before-completion 技能,并完整读取对应 SKILL.md。不要使用子代理。 开始前: - 确认工作目录和分支 trajplanner; - 确认提交 554c84f 与 8dd8ff0 存在; - 检查 git status --short 和暂存区; - 保存开始时的工作区状态用于结束时对照; - 当前工作区存在大量用户修改,全部保留,不得清理、覆盖或顺带提交; - 如果进度文件、Git 或实际文件不一致,先诊断并报告,不要直接覆盖。 阶段范围: - Task 1:Verification Host and Immutable Contracts; - Task 2:Configuration, Diagnostics, and Request Validation; - Task 3:Direction Segmentation and Exact Boundary Anchors。 执行要求: - 严格按 Foundation 计划逐任务进行 TDD; - 每个任务先运行计划指定的失败验证,再实现最小内容,再运行通过验证; - 每个任务形成独立提交,只用显式路径 git add; - 修改 ClumsyPilot/ClumsyPilot.csproj 前先查看现有差异,只追加本阶段要求; - 不修改无关 Map、CoarsePath、PathSmoothing 和旧 auto_avoidance 文件; - 不实现 Frenet、静态走廊、OSQP、LS、ST、滚动执行或动态障碍功能; - 主项目既有 auto_avoidance 依赖失败不能通过删除旧功能规避;使用计划中的隔离验证宿主; - 任何完成声明前运行计划指定验证和 git diff --check。 阶段结束时: - 确认 Task 1–3 各有独立提交和测试证据; - 运行截至 Task 3 的 Foundation 阶段出口验证; - 核对每个提交只包含计划文件,暂存区为空; - 更新 docs/superpowers/progress/em-planner-progress.md:记录提交、验证命令和结果,将阶段 1 标为 Completed,将阶段 2 标为 ready; - 只暂存进度文件并单独提交阶段检查点; - 返回本阶段完成内容、提交列表、测试证据、遗留问题; - 给出阶段 2 可直接复制的新窗口提示词。 ```