EM Planner Execution Progress
Current State
- Current stage: 6 — LS SQP and real scenarios
- Stage status: Completed
- Current branch:
trajplanner - Last checkpoint commit:
4d83ed2(last Stage 6 functional commit; this file is the Stage 6 checkpoint) - Protocol design baseline:
554c84f - Implementation-plan baseline:
8dd8ff0
Completed Tasks
| Stage | Plan | Tasks | Commits | Verification |
|---|---|---|---|---|
| 1 | 2026-08-03-em-planner-foundation-implementation.md |
Task 1 — Verification Host and Immutable Contracts | e12eb31 |
RED: foundation failed with missing VehicleMotionState/EmTrajectoryPoint; GREEN: foundation printed PASS foundation with exit 0. |
| 1 | 2026-08-03-em-planner-foundation-implementation.md |
Task 2 — Configuration, Diagnostics, and Request Validation | b326431 |
RED: foundation failed with missing configuration/validation types; GREEN: foundation printed PASS foundation twice with byte-identical stdout and exit 0. |
| 1 | 2026-08-03-em-planner-foundation-implementation.md |
Task 3 — Direction Segmentation and Exact Boundary Anchors | e492e16 |
RED: segmentation failed with missing ReferencePathSegmenter; GREEN: foundation and segmentation each printed their PASS line with exit 0. |
| 2 | 2026-08-03-em-planner-foundation-implementation.md |
Task 4 — Reverse-Safe Frenet Projection and Reconstruction | 06687e2 |
RED: frenet failed with missing Frenet types including FrenetProjector; GREEN: PASS frenet with forward/reverse sign, yaw-wrap, bounded U-branch, singular-denominator, and reconstruction checks. |
| 2 | 2026-08-03-em-planner-foundation-implementation.md |
Task 5 — Topology-Preserving Static Corridor | 2d252ff |
RED: corridor failed with missing static-corridor types; GREEN: PASS corridor, followed by all-foundation with all four PASS lines. |
| 2 | 2026-08-03-em-planner-foundation-implementation.md |
Task 6 — Foundation Documentation and Gate | aa62d6b |
RED: Foundation README was absent; GREEN: README contract scan passed. Placeholder/format scans passed, all-foundation passed twice with identical four-line stdout, and the normal-project baseline contained only legacy auto_avoidance errors. |
| 3 | 2026-08-03-em-planner-osqp-backend-implementation.md |
Task 1 — Solver-Neutral Sparse QP Contracts | 104081e |
RED: optimization failed with missing SparseTripletBuilder; GREEN: PASS optimization covered deterministic CSC canonicalization, duplicate summation, zero dropping, upper-triangular Hessians, QP validation, and defensive copies. |
| 3 | 2026-08-03-em-planner-osqp-backend-implementation.md |
Task 2 — Reproducible OSQP 1.0.0 Native Package | 2abb465 |
RED: the planned package script was absent; GREEN: the fixed-tag build printed OSQP v1.0.0 win-x64 package ready. The package contains the pinned DLL, license files, version/build flags, and lowercase SHA-256 manifest; dumpbin verified x64 and the four required exports. |
| 3 | 2026-08-03-em-planner-osqp-backend-implementation.md |
Task 3 — Absolute-Path Native Loader and ABI Structures | 39c1708 |
RED: osqp-loader failed with missing OsqpNativeLoader; GREEN: PASS osqp-loader verified missing/corrupt DLL diagnostics, real 1.0.0 loading from a copied plugin directory, and one stable handle across 16 parallel first-use calls. |
| 4 | 2026-08-03-em-planner-osqp-backend-implementation.md |
Task 4 — OSQP Solve Lifecycle and Status Mapping | a957fda |
RED: osqp-loader failed with missing OsqpNativeSolver; GREEN: fixed bounded, equality, infeasible and one-tick time-limit QPs pass inside a copied clean-plugin process. Status values 1–11 map to the planner-neutral contract, with finite metrics and captured native status. Twenty exact osqp solve/cleanup cycles printed PASS osqp-solve and PASS osqp-loader on every iteration. |
| 4 | 2026-08-03-em-planner-osqp-backend-implementation.md |
Task 5 — Backend Completion Gate | 61dfa79 |
RED: osqp was rejected by the verification-host command parser; GREEN: it runs the full solver/loader group. README now records the pinned package, deployment layout, absolute-load rule, ownership and status mapping. dumpbin /dependents found only Windows/runtime DLLs; an externally located working directory still loaded a copied clean plugin bundle and solved the micro QPs. |
| 5 | 2026-08-03-em-planner-lateral-ls-implementation.md |
Task 1 — Variable Layout and Exact Discrete Lateral Dynamics | c225b17 |
RED: lateral-model failed to build with missing LateralVariableLayout; GREEN: PASS lateral-model covered contiguous 4N-1 indices, range checks, unequal-S exact integration, station/corridor/start validation, defensive copies, and the lateral result publication contract. |
| 5 | 2026-08-03-em-planner-lateral-ls-implementation.md |
Task 2 — Normalized Objective and Linear Hard Constraints | f703d41 |
RED: lateral-model failed to build with missing LateralObjectiveBuilder; GREEN: PASS lateral-model inspected normalized P/q coefficients with 1e-12 comparisons, exact integration equalities, finite hard bounds, goal/gear versus rolling terminal behavior, empty-intersection early failure, and the solver-neutral fake-QP boundary. |
| 5 | 2026-08-03-em-planner-lateral-ls-implementation.md |
Task 3 — Nonlinear Geometry Evaluation and Independent Validation | 0c48a7d |
RED: lateral-model failed to build with missing LateralGeometryEvaluator; GREEN: PASS lateral-model covered straight and constant-curvature references in forward/reverse, full Frenet curvature, actual strictly increasing PathS, curvature/yaw-rate signs, and rejection of denominator, curvature, non-finite, and independently recomputed world-geometry violations. |
| 6 | 2026-08-03-em-planner-lateral-ls-implementation.md |
Task 4 — Sequential Convex Outer Loop and Feasible-Candidate Fallback | f19df53 |
RED: lateral-integration failed to build with missing SequentialConvexOptimizer and LateralPlanner; GREEN: PASS lateral-integration scripted validation-before-fallback, invalid-vector rejection, SolvedInaccurate residual/geometry rejection, 0.05 m trust centering, complete-primal warm starts, five-call cap, cancellation, timeout and facade behavior. |
| 6 | 2026-08-03-em-planner-lateral-ls-implementation.md |
Task 5 — Real-OSQP Lateral Scenarios and Gate | 4d83ed2 |
RED: lateral-all reached the real forward scenario but rejected the empty initial warm start; the subsequent loader diagnosis confirmed the host output bundle intentionally lacks osqp.dll. GREEN: the solver-neutral full initial primal and a clean copied plugin-bundle probe produced PASS lateral-model, PASS lateral-integration, and PASS lateral-real-osqp for deterministic forward/reverse straight, gentle curve, seed-connected obstacle narrowing, gear-switch, and rolling scenarios. |
Current Verification
- Commands:
dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- lateral-integrationdotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- lateral-alldotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- lateral-model1..20 | ForEach-Object { dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- osqp; if ($LASTEXITCODE -ne 0) { throw "OSQP verification failed on iteration $_" } }dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- optimizationdotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- osqp-loaderdotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- all-foundationC:\Program Files (x86)\Microsoft Visual Studio\2022\BuildTools\VC\Tools\MSVC\14.44.35207\bin\Hostx64\x64\dumpbin.exe /dependents ClumsyPilot/ThirdParty/OSQP/win-x64/osqp.dll- Clean copied plugin bundle: run
EMPlannerVerificationHost.exe osqp-probefrom a separate working directory. git diff --check
- Result: The Stage 5
lateral-modelgate exited 0 after all three Task commits. It proves the4N-1layout, exact unequal-station dynamics, immutable lateral inputs/results, normalized OSQP-convention P/q assembly, finite hard corridor/derivative/trust/denominator bounds, terminal distinction, full forward/reverse world reconstruction, actual PathS, and independent validation.optimization,osqp, and all fourall-foundationgroups exited 0. The dependency list remainsKERNEL32.dll,VCRUNTIME140.dll, and API-set CRT DLLs only—no MKL, CUDA or external QDLDL.git diff --checkhad no whitespace diagnostics; immediately before this checkpoint update the staging area was empty and no Stage 5 scope files were uncommitted. - Result: Stage 6 exit commands all exited 0 at
4d83ed2:lateral-integration;lateral-all(model, scripted SQP, and clean-plugin real OSQP groups);optimization;osqp;all-foundation; andgit diff --check. The real OSQP gate runs every fixed scenario twice and compares status, point count, and all lateral-path numeric fields within1e-10; the obstacle scenario stays in the negative, seed-connected corridor interval. The LS implementation remains dependent only onIQpSolver/QuadraticProgram; no LS P/Invoke, UI, hardware object, or current-working-directory dependency was added. - Normal-project baseline:
dotnet build ClumsyPilot/ClumsyPilot.csproj --no-restoreexits 1 only for the legacyauto_avoidance/MultiWheelAutoAvoidance.csmissingNetTopologySuite(3) andOpenCvSharp(1) references, plus that legacy file's duplicate-using warning. There are no EM Planner errors. - Verified commits:
104081e,2abb465,39c1708,a957fda,61dfa79,c225b17,f703d41,0c48a7d,f5c69c2,f19df53, and4d83ed2
Preserved Workspace State
- The workspace continues to contain the same unrelated Map, CoarsePath, PathSmoothing, project-file, report, and documentation changes captured at Stage 6 entry. They belong to the user and remain untouched and unstaged.
- Use explicit file paths for every
git add; never stage the whole workspace. - The existing user hunk in
ClumsyPilot/ClumsyPilot.csprojremains preserved. Do not clean, rewrite, or stage it. - The normal
ClumsyPilot.csprojbuild remains blocked by legacyauto_avoidance/MultiWheelAutoAvoidance.csreferences toNetTopologySuiteandOpenCvSharp; do not delete or bypass legacy functionality to change this baseline.
Decisions Needed
- None. Stage 6 completed within scope.
Next Stage
- Stage: 7 — ST model and longitudinal optimization
- Readiness: Ready for Stage 7 entry checks after this checkpoint is committed.
- Plan:
docs/superpowers/plans/2026-08-03-em-planner-longitudinal-st-implementation.md - Tasks:
- Task 1 — Speed Envelope over Actual PathS
- Task 2 — Time-Knot Layout, Dynamics, Objective, and Hard Constraints
- Task 3 — Longitudinal Outer Loop and Strict Validation
- Entry checks:
- Confirm branch
trajplanner,a957fda,61dfa79,c225b17,f703d41,0c48a7d,f5c69c2,f19df53, and4d83ed2are ancestors ofHEAD, and the Stage 6 progress checkpoint is present. - Capture
git status --shortbefore editing and preserve every unrelated user change. - Read the two EM Planner design documents, this progress file, and the longitudinal-ST implementation plan in full.
- Run
lateral-integration,lateral-all,optimization,osqp, andall-foundationbefore Task 1. - ST must consume actual, strictly increasing LS
PathSand keep the OSQP boundary solver-neutral throughIQpSolver.
- Confirm branch
- Exit gate:
- Tasks 1–3 each have an independent commit and their prescribed RED/GREEN evidence.
- The actual-PathS speed envelope, stopping precheck, ST dynamics/QP, and strict longitudinal validation pass.
- The Stage 7 plan's full exit gate and
git diff --checkpass; the staging area is empty; a Stage 7 progress checkpoint is committed alone.
Next-Window Prompt
请继续 ParkingRobot 仓库的 EM Planner 多窗口实施。
工作目录:D:\Users\Desktop\项目\prakrobot\ParkingRobot
本窗口只执行阶段 7:ST 模型与纵向优化。唯一授权范围是:
`docs/superpowers/plans/2026-08-03-em-planner-longitudinal-st-implementation.md` 的 Task 1、Task 2、Task 3。
不要开始轨迹发布、单次规划服务、滚动执行、控制适配、动态障碍物或任何后续阶段。
开始前必须完整读取:
1. `docs/superpowers/specs/2026-08-03-em-planner-ls-st-design.md`
2. `docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md`
3. `docs/superpowers/progress/em-planner-progress.md`
4. `docs/superpowers/plans/2026-08-03-em-planner-longitudinal-st-implementation.md`
使用 `executing-plans`、`test-driven-development` 和 `verification-before-completion`;不要使用子代理。只在 `trajplanner` 上工作。Stage 4–6 提交必须可从 `HEAD` 追溯:`a957fda`、`61dfa79`、`c225b17`、`f703d41`、`0c48a7d`、`f5c69c2`、`f19df53` 和 `4d83ed2`;随后是本进度文件的独立 Stage 6 checkpoint。若这些提交、进度记录或入口验证任一不一致,停止实施并先报告事实,不要猜测或重做已提交工作。
开始 Task 1 前:
- 保存完整 `git status --short` 基线,确认暂存区为空;工作区已有大量与 EM 无关的 Map、CoarsePath、PathSmoothing、报告、文档、项目文件和未跟踪修改,必须完整保留。
- 不得使用 `git add .`、`git add -A`、`git reset --hard`、`git checkout --` 或任何清理命令;每次只用显式路径暂存计划指定文件。
- 运行以下隔离入口验证,并确认全部退出码为 0:
```powershell
dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- lateral-integration
dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- lateral-all
dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- optimization
dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- osqp
dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- all-foundation
ClumsyPilot.csproj中有既有用户 hunk;正常项目构建仍会因旧auto_avoidance/MultiWheelAutoAvoidance.cs缺少NetTopologySuite与OpenCvSharp失败。不要修改、删除、屏蔽或绕过该旧模块,也不要把它当成 EM 回归。
实施约束:
- 严格逐任务 TDD:先增加该任务的最小失败检查,观察其因缺少目标行为而失败,再写最小生产代码,并运行计划指定 GREEN 验证。
- Task 1、2、3 各自形成独立功能提交;提交前用
git diff --cached --check和git diff-tree核对文件集合。 - ST 只能消费 LS 输出的实际、严格递增
PathS,并且只能通过既有 solver-neutralIQpSolver/QuadraticProgram边界使用 OSQP;不能向 ST 引入 P/Invoke、当前工作目录依赖、UI 或硬件对象。 - 不修改无关的 Map、CoarsePath、PathSmoothing、旧
auto_avoidance、已完成 LS 或 OSQP 后端;不实现轨迹发布、滚动执行、控制适配或动态障碍物。
阶段结束条件:
- 仅在 Task 1–3 均有独立提交、各自 RED/GREEN 证据和该计划全部出口验证通过后,运行 Stage 7 规定的 LS/ST/优化/OSQP/Foundation 回归及
git diff --check。 - 检查暂存区为空、用户的起始
git status --short修改仍被保留;然后只更新并单独提交docs/superpowers/progress/em-planner-progress.md。 - 最终报告必须给出实际提交、命令/退出码、未处理基线问题,并提供阶段 8(仅轨迹发布与单次规划服务 Task 4–6)的精确下一窗口提示词。