EM Planner Execution Progress

Current State

  • Current stage: 1 — Foundation contracts and boundaries
  • Stage status: Completed
  • Current branch: trajplanner
  • Last checkpoint commit: e492e16 (last Stage 1 functional commit; this file is the Stage 1 checkpoint)
  • Protocol design baseline: 554c84f
  • Implementation-plan baseline: 8dd8ff0

Completed Tasks

Stage Plan Tasks Commits Verification
1 2026-08-03-em-planner-foundation-implementation.md Task 1 — Verification Host and Immutable Contracts e12eb31 RED: foundation failed with missing VehicleMotionState/EmTrajectoryPoint; GREEN: foundation printed PASS foundation with exit 0.
1 2026-08-03-em-planner-foundation-implementation.md Task 2 — Configuration, Diagnostics, and Request Validation b326431 RED: foundation failed with missing configuration/validation types; GREEN: foundation printed PASS foundation twice with byte-identical stdout and exit 0.
1 2026-08-03-em-planner-foundation-implementation.md Task 3 — Direction Segmentation and Exact Boundary Anchors e492e16 RED: segmentation failed with missing ReferencePathSegmenter; GREEN: foundation and segmentation each printed their PASS line with exit 0.

Current Verification

  • Commands:
    • dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- foundation
    • dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- segmentation
    • git diff --check
    • git diff-tree --no-commit-id --name-only -r e12eb31
    • git diff-tree --no-commit-id --name-only -r b326431
    • git diff-tree --no-commit-id --name-only -r e492e16
  • Result: Stage 1 exit passed. foundation printed PASS foundation; segmentation printed PASS segmentation; both commands exited 0. git diff --check exited 0. Task 2 ran foundation twice with identical stdout. The isolated host build may display two pre-existing TireFollowing obsolete-API warnings; it displays no EM Planner warnings or errors.
  • Verified commit: e492e16

Preserved Workspace State

  • The workspace already contains many unrelated Map, CoarsePath, PathSmoothing, project-file, report, and documentation changes. They belong to the user and must remain untouched and unstaged.
  • Use explicit file paths for every git add; never stage the whole workspace.
  • Inspect the existing diff before modifying ClumsyPilot/ClumsyPilot.csproj, then append only the Stage 1 rules required by the Foundation plan.
  • The normal ClumsyPilot.csproj build can be blocked by legacy auto_avoidance/MultiWheelAutoAvoidance.cs references to NetTopologySuite and OpenCvSharp.
  • Stage 1 used the isolated EMPlannerVerificationHost rule. The normal project build was intentionally not used as a Stage 1 gate and no legacy functionality was deleted or rewritten.
  • Start and end git status --short both retain the user's unrelated changes; only the Stage 1 source and host additions were committed.

Decisions Needed

  • None. Stage 1 completed within scope.

Next Stage

  • Stage: 2 — Foundation coordinates and corridor
  • Readiness: Ready for Stage 2 entry checks.
  • Plan: docs/superpowers/plans/2026-08-03-em-planner-foundation-implementation.md
  • Tasks:
    • Task 4 — Reverse-Safe Frenet Projection and Reconstruction
    • Task 5 — Topology-Preserving Static Corridor
    • Task 6 — Foundation Documentation and Gate
  • Entry checks:
    • Confirm branch trajplanner.
    • Confirm e12eb31, b326431, and e492e16 exist and each has only its recorded Stage 1 task files.
    • Confirm the staging area is empty.
    • Capture git status --short before editing.
    • Run the isolated host foundation and segmentation groups; both must pass before Task 4 starts.
    • Preserve all unrelated user changes, including the existing modified ClumsyPilot.csproj hunk.
  • Exit gate:
    • Each of Foundation Tasks 46 has its own passing verification and independent commit.
    • all-foundation passes twice with deterministic four-line output.
    • The normal project baseline is recorded separately; only the documented legacy auto_avoidance dependency errors may remain.
    • git diff --check reports no new whitespace errors and the staging area is empty after task commits.
    • This progress file is updated to mark Stage 2 completed and Stage 3 ready, then committed alone.

Next-Window Prompt

请继续 ParkingRobot 仓库的 EM Planner 多窗口实施。

工作目录:D:\Users\Desktop\项目\prakrobot\ParkingRobot

本窗口是阶段 2Foundation 坐标与走廊,只执行 Foundation 实施计划的 Task 4–6,不得提前执行阶段 3 或后续阶段。

开始工作前必须完整读取:
1. docs/superpowers/specs/2026-08-03-em-planner-ls-st-design.md
2. docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md
3. docs/superpowers/progress/em-planner-progress.md
4. docs/superpowers/plans/2026-08-03-em-planner-foundation-implementation.md

执行时使用 executing-plans、test-driven-development 和 verification-before-completion 技能,并完整读取对应 SKILL.md。不要使用子代理。

开始前:
- 确认工作目录和分支 trajplanner
- 确认提交 e12eb31、b326431 与 e492e16 存在;
- 检查 git status --short 和暂存区;
- 保存开始时的工作区状态用于结束时对照;
- 当前工作区存在大量用户修改,全部保留,不得清理、覆盖或顺带提交;
- 如果进度文件、Git 或实际文件不一致,先诊断并报告,不要直接覆盖。
- 运行:
  - `dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- foundation`
  - `dotnet run --project ClumsyPilot/tests/EMPlannerVerificationHost/EMPlannerVerificationHost.csproj -- segmentation`
  两者必须通过后才能开始 Task 4。

阶段范围:
- Task 4Reverse-Safe Frenet Projection and Reconstruction
- Task 5Topology-Preserving Static Corridor
- Task 6Foundation Documentation and Gate。

执行要求:
- 严格按 Foundation 计划逐任务进行 TDD;
- 每个任务先运行计划指定的失败验证,再实现最小内容,再运行通过验证;
- 每个任务形成独立提交,只用显式路径 git add
- 修改 ClumsyPilot/ClumsyPilot.csproj 前先查看现有差异,只追加本阶段要求;
- 不修改无关 Map、CoarsePath、PathSmoothing 和旧 auto_avoidance 文件;
- 不实现 OSQP、LS、ST、滚动执行或动态障碍功能;
- 主项目既有 auto_avoidance 依赖失败不能通过删除旧功能规避;使用计划中的隔离验证宿主;
- 任何完成声明前运行计划指定验证和 git diff --check。

阶段结束时:
- 确认 Task 4–6 各有独立提交和测试证据;
- 运行完整 Foundation 阶段出口验证(`all-foundation` 两次)及计划指定的正常项目基线检查;
- 核对每个提交只包含计划文件,暂存区为空;
- 更新 docs/superpowers/progress/em-planner-progress.md:记录提交、验证命令和结果,将阶段 2 标为 Completed,将阶段 3 标为 ready;
- 只暂存进度文件并单独提交阶段检查点;
- 返回本阶段完成内容、提交列表、测试证据、遗留问题;
- 给出阶段 3 可直接复制的新窗口提示词。