EM Planner Execution Progress
Current State
- Current stage: 1 — Foundation contracts and boundaries
- Stage status: NotStarted
- Current branch:
trajplanner - Last checkpoint commit: None; Stage 1 has not started
- Protocol design baseline:
554c84f - Implementation-plan baseline:
8dd8ff0
Completed Tasks
| Stage | Plan | Tasks | Commits | Verification |
|---|---|---|---|---|
| — | — | — | — | No implementation task has started |
Current Verification
- Commands:
git cat-file -e 554c84f^{commit}git cat-file -e 8dd8ff0^{commit}git branch --show-currentgit diff --cached --name-only
- Result: Bootstrap prerequisites passed; Stage 1 entry is ready
- Verified commit:
554c84ffor protocol design and8dd8ff0for implementation plans
Preserved Workspace State
- The workspace already contains many unrelated Map, CoarsePath, PathSmoothing, project-file, report, and documentation changes. They belong to the user and must remain untouched and unstaged.
- Use explicit file paths for every
git add; never stage the whole workspace. - Inspect the existing diff before modifying
ClumsyPilot/ClumsyPilot.csproj, then append only the Stage 1 rules required by the Foundation plan. - The normal
ClumsyPilot.csprojbuild can be blocked by legacyauto_avoidance/MultiWheelAutoAvoidance.csreferences toNetTopologySuiteandOpenCvSharp. - Stage 1 must use the isolated
EMPlannerVerificationHostrule from the Foundation plan. Do not delete or rewrite legacy functionality to hide the baseline build failure.
Decisions Needed
- None. The Stage 1 scope and contracts are approved.
Next Stage
- Stage: 1 — Foundation contracts and boundaries
- Plan:
docs/superpowers/plans/2026-08-03-em-planner-foundation-implementation.md - Tasks:
- Task 1 — Verification Host and Immutable Contracts
- Task 2 — Configuration, Diagnostics, and Request Validation
- Task 3 — Direction Segmentation and Exact Boundary Anchors
- Entry checks:
- Confirm branch
trajplanner. - Confirm commits
554c84fand8dd8ff0exist. - Confirm the staging area is empty.
- Capture
git status --shortbefore editing. - Confirm no prior Stage 1 functionality commit is recorded; if EM files already exist, inspect and reconcile them before continuing.
- Confirm branch
- Exit gate:
- Each of Foundation Tasks 1–3 has its own passing verification and independent commit.
- The Foundation verification host passes
foundationandsegmentationgroups required through Task 3. - Exact gear-switch approach/departure identities and exact horizon anchors are verified.
git diff --checkreports no new whitespace errors.- The staging area is empty after all task commits.
- This progress file is updated to mark Stage 1 completed and Stage 2 ready, then committed alone.
Next-Window Prompt
请继续 ParkingRobot 仓库的 EM Planner 多窗口实施。
工作目录:D:\Users\Desktop\项目\prakrobot\ParkingRobot
本窗口是阶段 1:Foundation 契约与边界,只执行 Foundation 实施计划的 Task 1–3,不得提前执行 Task 4 或后续阶段。
开始工作前必须完整读取:
1. docs/superpowers/specs/2026-08-03-em-planner-ls-st-design.md
2. docs/superpowers/specs/2026-08-03-em-planner-windowed-execution-design.md
3. docs/superpowers/progress/em-planner-progress.md
4. docs/superpowers/plans/2026-08-03-em-planner-foundation-implementation.md
执行时使用 executing-plans、test-driven-development 和 verification-before-completion 技能,并完整读取对应 SKILL.md。不要使用子代理。
开始前:
- 确认工作目录和分支 trajplanner;
- 确认提交 554c84f 与 8dd8ff0 存在;
- 检查 git status --short 和暂存区;
- 保存开始时的工作区状态用于结束时对照;
- 当前工作区存在大量用户修改,全部保留,不得清理、覆盖或顺带提交;
- 如果进度文件、Git 或实际文件不一致,先诊断并报告,不要直接覆盖。
阶段范围:
- Task 1:Verification Host and Immutable Contracts;
- Task 2:Configuration, Diagnostics, and Request Validation;
- Task 3:Direction Segmentation and Exact Boundary Anchors。
执行要求:
- 严格按 Foundation 计划逐任务进行 TDD;
- 每个任务先运行计划指定的失败验证,再实现最小内容,再运行通过验证;
- 每个任务形成独立提交,只用显式路径 git add;
- 修改 ClumsyPilot/ClumsyPilot.csproj 前先查看现有差异,只追加本阶段要求;
- 不修改无关 Map、CoarsePath、PathSmoothing 和旧 auto_avoidance 文件;
- 不实现 Frenet、静态走廊、OSQP、LS、ST、滚动执行或动态障碍功能;
- 主项目既有 auto_avoidance 依赖失败不能通过删除旧功能规避;使用计划中的隔离验证宿主;
- 任何完成声明前运行计划指定验证和 git diff --check。
阶段结束时:
- 确认 Task 1–3 各有独立提交和测试证据;
- 运行截至 Task 3 的 Foundation 阶段出口验证;
- 核对每个提交只包含计划文件,暂存区为空;
- 更新 docs/superpowers/progress/em-planner-progress.md:记录提交、验证命令和结果,将阶段 1 标为 Completed,将阶段 2 标为 ready;
- 只暂存进度文件并单独提交阶段检查点;
- 返回本阶段完成内容、提交列表、测试证据、遗留问题;
- 给出阶段 2 可直接复制的新窗口提示词。